Wind-Worker™ Tower Placement System

Plastics Solutions USA



ADB® continues to be innovative by providing the wind energy a safe and efficient solution for rigging each section of the flanged tower section. The patented design allows for universal fit on most towers and mounting fasteners can be customized as needed to meet the most intricate flange hole dimensions.

The system consists of 4 tower top placement tools and 2 tower base placement tools consisting of a system capacity of 100 tons. The system is designed to allow for rigging to and from transport vehicles, to site preparation, and finally for tower installation. The system can also be used for maintenance applications which require tower sections to be removed.

  • 100 Ton System Working Load Limit (larger WLL available)
  • 360° Swivel Range
  • 180° Pivot Range
  • 5:1 Design Factor
  • Greatly Reduces Sling Bind
  • Corrosion Resistant Plating
  • Each Tool is Serialized and Proof Tested to 200% of its WLL
  • Adjustable for Universal Fit on Most Towers
  • 100% Technical Support from Quote to Final Lift

 


We Also Recommend

En-Guard™ Hoist Rings (lbs)

En-Guard™ Hoist Rings (lbs)

En-Guard™ Hoist Rings (kg)

En-Guard™ Hoist Rings (kg)

EZ-Torque® Hoist Rings (lbs)

EZ-Torque® Hoist Rings (lbs)

Flip-Flop Hoist Rings

Flip-Flop Hoist Rings

High-Vis Hoist Ring (lbs)

High-Vis Hoist Ring (lbs)